Another Day At The Gunk Haus ...

Today was one of those days where a lot happens, but nothing that would make the front page.

E! was busy painting the south side.

Ray's guys came over to install a piece of stainless steel back splash, which they didn't have last time around.

I continued pulling PEX tubing for the third floor heating. The aluminum enforced tube has a one inch outer diameter, and is tough to navigate, especially around turns, but it beats working with a torch next to 200 year old bone dry wood.

Aside from that was office work, book keeping, requesting a refund for over payment, and ordering radiators (Heizkörper) for the beer hall. I will be all giggly when they arrive.

Dirk

1 comment:

时间 said...

0810jejeUn directeur asics bleu lacet rose virtuel de ce personnel sera confronté à la tâche décourageante nike air jordan flyknit de s'assurer que chaque membre interagit librement et efficacement nike air max 1 homme noir et blanche sur tous les réseaux. Les 5, new balance femme gris et blanc 6 et 7 sont des cavités Nike Split asics chaussures tennis homme avec une pondération de périmètre, mais pas basket nike cortez kaki le canal des longs fers. Stetson, le fils air jordan 37 d'un chapelier, a remarqué la robe de tête nike air huarache algerie inadaptée, il a décidé de façonner un chapeau plus fonctionnel. asics gel noosa tri 11 France