Yesterday was a long day, E! was up on the rig the whole day, and she kicked ass. She got the south side mostly done (to paint the left side, we'll have to move the aerial lift around the house, which we'll do after the east side):
Meanwhile I finished work on the stand/cover for the service panel (Sicherungskasten) for the parking lot side. E! was very kind, and let me play around a little, spending almost three days on this project. I always wanted to do a little timber frame (Fachwerk) project, and this was just perfect. Below you see the two halfs of the stand/cover/whateveryouwanttocallit.
And here is half the stand/cover/youknowwhat assembled and set in concrete footings, for which I used clay flues from the old kitchen chimney, that I had taken down earlier in the year.
Dirk
2 comments:
may be useful for all, helpful article once and pardon me permission to share also here :
Cara mengatasi ruam popok
Obat kebas
Cara menyembuhkan PPOK
0728jejeTout d'abord, nike air jordan 1 mid herren sport & outdoorschuhe les membres devraient vraiment comprendre et apprécier basket nike blanche homme la culture de chacun. Pendant que femme nike roshe run argent noir rose baskets basses je naviguais sur Internet, j'ai découvert asics femme gel lyte blanche qu'il y avait une dernière air jordan 11 cherry low price braderie où ils vendent de nombreux accessoires achat chaussures running asics pour chiens. C'est vraiment déterminé adidas zx 700 femme sarenza principalement avec le contenu et asics gel nimbus 16 homme les entrées habitués à générer la chaussure.
Post a Comment