Wednesday, March 10, 2010

First Row Is The Toughest ...

I started installing the oak flooring in the beer hall today. The first row is always the toughest, although it turned out rather easy (the key is to pick very straight pieces, and to have a laser level which keeps you honest).

After hand-nailing three or four rows I switched to the *bleep*ing manual nailer. I have started to get a hang of it, so it wasn't as frustrating as when I used it first time around.

OK, folks, I'm tired, go look at the pictures ...










Dirk